Cowley Beach Boat Ramp Maintenance

Project Description / Overview:

Removal of existing boat ramp and supply and install precast RG4000 concrete plank boat ramp.

Client:

TMR

Project Features:

  • Remove and dispose of the existing ramp slab
  • Supply and install anchor beam type 2(approx. 4 cubic metres)
  • Supply material and construct crushed rock core as per SD4021
  • Supply & install precast concrete planks
  • 18 x planks (RG4000)
  • 1 x anchor plank (RG4000)
  • 1 x terminator plank (T4000) at the toe
  • Supply & construct grouted rock shoulders (full length of ramp slab) as per SD4022
  • As constructed survey